Thank you for your interest in doing business with the City of Placerville!
The City purchases and contracts for a wide variety of supplies, services, equipment, and expert assistance to provide our community with a full range of municipal services and programs.
A list of projects and activities currently soliciting proposals and bids can be found below. If you have questions about a specific project, contact the project manager listed within each RFP/RFQ.
ENGINEERING DEPARTMENT
Consulting Services:
1. Water Reclamation Facility Belt Filter Press Building Improvements (CIP#42233): The proposal is due Monday, June 1, 2026, at 3:00 p.m. at 2300 Coolwater Creek, Placerville, CA 95667.1
Belt Press Building RFP Phase 1
Structural Observation of Existing Building Report
Construction Projects:
1. Giovanni Road Sewer Line Replacement Project - (CIP #42224): The bid opening was held on June 18, 2026 at 2:00 pm at 3101 Center Street, Placerville CA, 95667, Engineering Department 3rd Floor.
Giovanni Road Sewer Line Replacement Project- Specs - Book 1
Giovanni Road Sewer Line Replacement Project- Specs - Book 2
Giovanni Road Sewer Line Replacement Project- Plans - 11x17
Giovanni Road Sewer Line Replacement Project- Plans - 24x36
2. Storm Drain Replacement - Upper Broadway and Point View Drive - (CIP #42320): The bid opening was held on June 25, 2026 at 2:00 pm at 3101 Center Street, Placerville CA, 95667, Engineering Department 3rd Floor.
Storm Drain Replacement - Upper Broadway and Point View Drive - Specs - Book 1
Storm Drain Replacement - Upper Broadway and Point View Drive - Specs - Book 2
Storm Drain Replacement - Upper Broadway and Point View Drive - Plans - 11x17
Storm Drain Replacement - Upper Broadway and Point View Drive - Plans - 36x24
3. Water Reclamation Facility Digester No. 1 Servicing (CIP#42109): The proposal is due Monday, May 15, 2026, at 3:00 p.m. at 2300 Coolwater Creek, Placerville, CA 95667.
CIP 42109 Digester 1 Cleaning Final
Digester Plan 1 Record Drawings
4. Water Reclamation Facility Primary Clarifier No. 1 Coating Services (CIP#42504): The proposal is due Monday, May 15, 2026, at 3:00 p.m. at 2300 Coolwater Creek, Placerville, CA 95667.
CIP 42504 Primary Clarifier No. 1 RFP
Primary Clarifier #1 Record Drawings
Recent Bid Results:
1. Placerville Drive Pedestrian Connectivity Project (CIP #42337): The bid opening was held on Tuesday, August 19, 2025 at 3:00 pm.
Placerville Dr Pedestrian Connectivity - Bid Tabulation
Placerville Dr Ped Conn - Book 1 of 2
Placerville Dr Ped Conn - Book 2 of 2
Placerville Dr Ped Conn - Full Size Plans
Placerville Dr Ped Conn - Addendum 1
Placerville Dr Ped Conn - Addendum 2
2. Smith Flat Road Storm Drain and Paving Project (CIP #42213): The bid opening was held on June 17, 2025 at 3:00 pm.
Smith Flat Rd - Bid Tabulation
Smith Flat Road - Bid Docs - Book 1
Smith Flat Road - Bid Docs - Book 2
Smith Flat Road - Bid Docs - Plans (Full Size)
Smith Flat Road - Bid Docs - Plans (Half Size)
3. Thompson Way/Sheridan Street/Sherman Street Repaving Project - Phase 2 (CIP #42206/42324/42208): The bid opening was held on April 9, 2026 at 2:00 pm.
Thompson Way Repaving-Phase 2 - Bid Tabulation
Thompson Way Repaving-Phase 2 - Specs - Book 1
Thompson Way Repaving-Phase 2 - Specs - Book 2
Thompson Way Repaving-Phase 2 - Plans - 11x17
Thompson Way Repaving-Phase 2 - Plans - 36x24
Thompson Way Repaving-Phase 2 - Addendum 1
Consulting Services:
None at this time.
ADMINISTRATION DEPARTMENT
None at this time.
FINANCE DEPARTMENT
None at this time.
COMMUNITY SERVICES
None at this time.
POLICE DEPARTMENT
None at this time.
PUBLIC WORKS DEPARTMENT
None at this time.
DEVELOPMENT SERVICES DEPARTMENT